Henry MS will also be impacted by the following campus-specific bond project:
Music Instrument Replacement

School Modernization (Design Only)

Project Scope

Built in 2002, Henry MS is on track for needing a modernization in the near future. While exceeding the 20-year threshold typically used to determine when a modernization is needed, the health of a school’s Heating, Ventilation, and Air Conditioning (HVAC) system is another major factor in prioritizing each school’s modernization need.

Modernization of an existing facility involves the replacement of major building sub-systems including but not limited to roofing, elevators, air conditioning, lighting, electrical, plumbing, fire protection systems, built-in specialties and equipment, interior finishes and all furnishings that are at the end of the expected service life.

The funding from Bond 2023 covers design costs only for the school’s modernization. The remaining funds for the modernization would appear in a future bond.

Project Status

  • Fall 2025 (Estimated)
    Work on this project will begin with the Design phase.
  • August 2023
    At the Aug. 24, 2023 Board meeting, Trustees approved the architect and construction manager.

Project Details

Phase

Pencil Icon

Design

Estimated Timeline

Start: Fall 2025 (Start of Design phase)
Finish: To be determined

Funding Source

Bond 2023 (Design only)
* Construction costs would be included in a future bond.

Estimated Project Cost

$3,499,584 (Design only)

Guaranteed Maximum Price (GMP) *

GMP(s) will come later in the process and go before the LISD Board for approval.

* GMPs cover construction costs only. The total project cost will incorporate design and permitting fees, along with furniture, fixtures and equipment.

Note: The actual cost will be listed here upon project completion. Any money leftover from the budget goes into project savings, managed by the Bond Oversight Committee.

Contractors

  • Engineer: MEP Engineering
  • Construction: Joeris General Constructors
    Approved for construction when funded